OUR MACHİNES

  • AKYAPAK10 Axis Three Spindle CNC Drill Line………………………………   1
  • AKYAPAK Flange Drilling Machine   ……………………………………….  1
  • DURMA VS SERİES CNC Hydraulic Variable Rake Angle GuillotineShear.. 1
  • DURMA Press Brake…………………………………………………………    1
  • AJAN 5 Axis Plate and Tube CNC Plasma Cutting Machine…………………  1
  • REMS Unimat75 Threading …………………………………………………… 1
  • GBH Automatic Shot Blasting Machine …………………………..…………..  1
  • CEVISA Bevelling machine……………………………………………………  1
  • STİERLİ rotator turning device   ………………………………………………  4
  • UZAY Full automatic bandsaw machine   ……………………………………   5
  • ESAB welding machine   ……………………………………………………..   20
  • KEMPPI welding machine ……………………………………………………   2
  • FRONIUS welding machine  ………………………………………………..     10
  • DEMAG 20 crane  …………………………………………………………….   3
  • DEMAG 15 crane  ……………………………………………………………..  1
  • DEMAG 10 crane ……………………………………………………………..   4
  • DEMAG 5 crane ……………………………………………………………….. 3
  • DEMAG 1 ton pergel crane ……………………………………………………  2
  • TEKSAN genarator  ……………………………………………………………  1
  • EKOMAK compressor…………………………………………………………   2
  • LARİUS pneumatic airless pumps for painting ………………………………   3
  • ESIT 40t Steel Platform Truck Scale  …………………………………………  1
  • ELS Human Platform 14MT ……………………………………………………2
  • PM Mobil Crane ………………………………………………………………  3
  • YALE 5t Forklift ……………………………………………………………      1

We have ;

2 welders EN ISO 9606-1 135 P BW FM1 S s12 PA bs,

2 welders EN ISO 9606-1 135 P FW FM1 S t30 PB ml,

1 welder EN ISO 14732:2013, 

1 International welding engineer for welding.

We have;

1 mechanical enginner

1 civil engineer

1 project designer and these persons will draw your Project’s shopdrawwings.

We have sandblasting machine and paint workshop area in our main factory.

You can check the Project of AYKIN SHIPYARD. which did two years ago.Column length is 30060mm and Profile is HI300x25-750x15.

We have 45 persons on  1 shift yet. But İf we will start your job we must to work 2 shifts a day.

Our working scale will be like that.

 

After receive your workable and acceptable L/C and also receive the advanced payment.

The first shipment 2(two) months later --- 450 ton

The second shipment 3(three) months later --- 700 ton

The third shipment 4(four) months later --- 700 ton

The fourth shipment 5(five) months later --- 700 ton

 

All the goods will be in Basrah port within 6(six) months.

Our assembly team will go to Basrah 5(five) months later, after receive your workable and acceptable L/C and also receive the advanced payment.

And our assembly will be finalize 7(seven) months later, after receive your workable and acceptable L/C and also receive the advanced payment.

I will sent you AYKIN SHIPYARD’s pdf files and our factory Paint and sandblasting area .

If you need any information you can ask.

Best regards.